Skip to main content
Our Work

Commercial Projects

Aberdeen Hall Preparatory School

Phases 3 and 4 of Aberdeen Hall’s High School and Vision Hall.

LOCATION/CITY:
Kelowna

DEVELOPER/BUILDER:
Team Construction

ARCHITECT/DESIGNER:
Meiklejohn

PROJECT SIZE:
Three separate phases of 2-3 storey buildings

YEAR BUILT:
2011, 2014, 2015

PROJECT HIGHLIGHTS:

  • T-Bar Ceilings
  • Drywall Installation
  • Insulation
  • Acoustic Wood Ceilings
  • Engineered Steel Stud Framing

Audi Kelowna

Littco was proudly involved in the wall and ceilings construction of Audi’s brand new state of the art showroom.

LOCATION/CITY:
Kelowna

DEVELOPER/BUILDER:
Sawchuk

ARCHITECT/DESIGNER:
MQN Architects

PROJECT SIZE:
Renovations and construction of new dealership

YEAR BUILT:
2013

PROJECT HIGHLIGHTS:

  • Steel stud framing
  • Drywall
  • Specialty ceilings
  • T-Bar Ceilings
  • Batt and Spray Insulation

Jaguar Land Rover Volvo

Littco supplied multiple high-end specialty finishes for the new Jaguar Land Rover Volvo dealership.

LOCATION/CITY:
Kelowna

DEVELOPER/BUILDER:
HJ Kamerbeek Construction

ARCHITECT/DESIGNER:
Faction Architecture

PROJECT SIZE:

YEAR BUILT:
2018

PROJECT HIGHLIGHTS:
High end dealership featuring many specialty finishes

  • Engineered Steel Stud Framing
  • Drywall
  • Specialty Ceilings
  • Wood Ceilings
  • Acoustic Ceilings

JoeAnna’s House

JoeAnna’s House is comprised of 20 guest suites that allows families from outside the area to stay together when one needs medical attention in Kelowna. Littco provided a large donation to this project.

LOCATION/CITY:
Kelowna

DEVELOPER/BUILDER:
Team Construction

ARCHITECT/DESIGNER:
Meiklejohn Architects

PROJECT SIZE:
2 Levels & 20 units

YEAR BUILT:
2019

PROJECT HIGHLIGHTS:

  • Light Gauge Steel Stud Framing
  • Drywall
  • Acoustic t-bar Ceilings

Porsche Kelowna

In 2018, Littco proudly won the Southern Wall and Ceilings Association Best Project of the year for its involvement in the Kelowna Porsche dealership construction.

LOCATION/CITY:
Kelowna

DEVELOPER/BUILDER:
HJ Kamerbeek

ARCHITECT/DESIGNER:
Faction Architecture

PROJECT SIZE:
22,765 SQFT

YEAR BUILT:
2018

PROJECT HIGHLIGHTS:
Drywall Installation, highlighted by the large curved exterior wall finished to Level 5, with ½ inch by ½ inch reveals that mirror the exterior panel reveals.

  • Engineered Steel Stud Framing
  • Light Gauge Steel Stud Framing
  • Acoustic Ceilings

Let’s Talk About Your Next Build.

Whether you’re managing a large commercial job or need expert support for specialty finishes, Littco Enterprises is ready to help bring your vision to life.